Week ending 2/19/2012: Monday Don and I worked on the install of crank shaft for the c6 /8.3 liter marine engine. My truck had been giving me trouble when ideling, it wanted to die at times. I pulled it in to the bay and plugged the snap on computer to it and found no codes except a transmission code. Jeff guided me in the direction of checking the battery under load. The battery cells were gone and I replaced the battery. Replacing the battery solved the problem and I know now to check that first then go from there. Above you will see 3 videos of the c6 and how to install the crank and torque procedures. We spent the next 3 days on installing the piston packs and research. I also fabricated a side door for my utility trailer and spent 8 hours on saturday finishing the welding and painting of my trailer for a totol of 36 hrs.