The spring quarter was packed with a lot of learning at Williams I helped on various projects.Such as the turbo install on the Clark tcv 12 and the compressor, new pistons and rods installation on unit 5. and the pig launch projects.I also worked on smaller projects such as the new deck for the two axle trailer I installed and the painting and labeling of the tested and non tested pipes in the yard.The meter station demo of the old hydro lines and reinstall of the new ones was challenging but got it done. I did learn alot on the testing and tear down of stock pipe in the yard helping the welder.or the vent piping install on sippi nine, during the wet month of March.
There was many days of organizing and helping in the warehouse all in all spring Quarter at Williams was a great.In the shop at school I learned the Electrical boards and found the problem with the horn on the dodge the problem with the pin being missing in the harness of the Kenworth lights and testing on the loader simulator.Seems totally different from a real loader after many years of operating loaders such as cat IT 28 or 988B ,980 or john deere and komatsu loaders, scrapers21,31 and paddle wheels excavators ,haul trucks graders , dozers of all sizes seemed to me the simulator was a bit more challenging.but fun. I had tested on the simulator at the 302 operators in Bothell and did pass on the dozers though.I learned about fittings and cut a hose and installed some fittings,I did learn about hydraulics and tested the pressure on the bobcat excavator,This has sparked a great interest in me to learn more of in the future.I see myself working in the power generation field. I have learned to learn and to research to find my answers.
Thank you Jeff for teaching me to use the greatest tool of all.
Year To Date Overview | ||||||||||
|
Wednesday, June 5, 2013
worked hours this quarter 300 school and work
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment