Thursday, April 5, 2012
Wednesday, April 4, 2012
Sunday, March 18, 2012
Winter Quarter Internship hours
January hours= 102
February hours=120
March hours=121.5
Total hours for Winter Quarter Diesel Internship program =343.5
February hours=120
March hours=121.5
Total hours for Winter Quarter Diesel Internship program =343.5
Working on Scruber
This is the inside of a filter separator also known as scrubber. A scrubber is a filtration system that is used to filter all particles in the main gas line before it enters the compressor it has a total of 64 six foot filters. We replaced the filters and the oring on this unit.
|
The ring that holds the door to the scrubber is held together by 2 bolts and a safety pin that compress to tighten the door. There is a rubber oring to seal the gas from leaking out which is set in a grove which must be lubed with lubriplate to prevent from rolling it out when tightening the clam shell door.
Air respirator and fire retardant and chemical retardant protective gear is necessary to work on a scrubber.. |
Sunday, March 11, 2012
Finishing up the Exhaust job
82 hours including computer research
View of top of engine block. |
Last week I posted some pictures of the work done to the Clarke TCV 12 I learned alot about the engine after helping Brandon on the exhaust job. The project took us 8 days primarily because of the size of exhaust and all the coolant and gas lines needed to be taken out of the way to get to the exhaust.On an engine this size everything needs to be handled with an overhead crane.We installed the new gaskets to the exhaust an also to the coolant and fuel lines and replaced some gaskets on one the engines compressors.I then went to help Teason (aka T-Bone ) on calibrating some of the pressure sensors on the 2000 hp Ingersol Rand engines he monitors Where he was teaching me how to calibrate the sensors which monitor pressures and temperatures on the engines all computerized and are also remotely monitored from the Utah main site.I also spent time learning how to adjust and replace intake exhaust and fuel valves on the Ingersol Rand engine monitored by Ray he taught me how to set the valve lash on it I have added some more pictures and will post more during the week.
.
Wednesday, February 29, 2012
Manifold Gasket Replacement hours for the Month of Febuary are 120 hours
The two twenty inch pipes below connect to the exhaust on the engine.
The picture below shows the exhaust. Next to the exhaust is the coolant pipe.
The picture below shows the 3 compressors tied into the engine. Each compressor has an individual arm connected to the crankshaft.
As you can see in the picture below the 6 ports of the exhaust. Each exhaust tube weighs 8,500 lbs and has a 20" diameter.
Each one of these is a head on one side of the engine. There is a total of 12 heads to the engine.
Below is a picture of the top of the engine block where the exhaust is placed. Each hole is where we will be installing the new gaskets.The smaller holes you can see are for the coolant ports.
To take off the exhaust was one entire day.