Monday, February 27, 2012

Internship at Williams Pipeline

Today, I started the job shadow position at Williams. I started with an introduction to the employees working there.  After an exstensive safety awareness insight of their ESD (Emergency Shutdown Procedure) I then wathched  thier PPE video,  we proceded to work in Unit B on the Clark TCV12.  The Clark TCV12 runs at 4,000 hp.we are working on replacing the  exhaust  manifold gaskets.7am -4pm

Thursday, February 23, 2012

Share the knowledge

 My Cap 101 project was a hit , In the project I created a PowerPoint presentation of the work I have done in the shop and inserted some of the videos taken on the c6 Cummings engine assembly.I also linked it to my blog. .My intention was to make the class aware of the Diesel program and the projects I had worked on. I was  teaching  them to create a blog and store  information.straight from their smart phones. 
Monday.We worked on installing main bearing caps and torqued down to specs. Ian,Chris and I met with the ASBTC Senate on Wednesday and spoke to them on the requested funds for the Denmark xchange program. Total hours for week ending 2/25  are 28 hours 

m

Monday, February 20, 2012

shop time










Week ending 2/19/2012:  Monday Don and I worked on the install of crank shaft for the c6 /8.3 liter marine engine.  My truck had been giving me trouble when ideling, it wanted to die at times.  I pulled it in to the bay and plugged the snap on computer to it and found no codes except a transmission code.  Jeff guided me in the direction of checking the battery under load.  The battery cells were gone and I replaced the battery.  Replacing the battery solved the problem and I know now to check that first then go from there.  Above you will see 3 videos of the c6 and how to install the crank and torque procedures.  We  spent the next 3 days on installing the piston packs and research. I also fabricated a side  door for my  utility trailer and spent 8 hours on saturday finishing  the welding and painting of my trailer  for a totol of 36  hrs.

Sunday, February 19, 2012

Clark 4500HP 12 Cyliner Engine Piston and Liner Replacement


On the link below is pictures of engines, pistons and parts. This is like the one I seen at the commpressor station where I will be doing an internship.


Clark 4500HP 12 Cyliner Engine Piston and Liner Replacement

Monday, February 6, 2012

Clutch replacement on mazda

We replaced clutch on Mazda frontwheel drive last week. 12 hrs and worked on 3cylinder 20 shop time research and total is 32 week ending 2/5/2012


Tuesday, January 31, 2012

January total hours 103

Jeff I posted my hours for the month of January  thankyou .

Diesel 3 cylinder Ford engine

Reflection of Monday and Tuesday,( Keep Trying Don't Give Up) Yesterday we prepared the engine for starting we checked the compression and it was great we added coolant and aw we found a leek  coming out from  the lower corner of the water pump dissembled and analyzed  .I found one of the gaskets,  on the pump was not the correct one. We made a new one and installed it( leaked fixed. ).



      Today we tried to start the engine no luck after finding out the fuel was not going into the injectors I then dissembled the fuel lines from the governor to injectors and found no fuel coming out.  I then  adjusted the position of delivery valve assembly fuel then  gushes to  the injector . after trying to start still no luck  tomorrow I will start it .January 2012  total hours 103 hrs